Skip to main content
  • We tried.

    The members of the 2012 Dynatech Expedition to Shipilov Peak will arrive in Madrid tonight.

    During several days, they have been battling to tackle the top of Shipilov but this mountain has proven to be extremely hard and inaccessible.   The abundant snowfalls in the area maintain an enormous amount of powdery snow accumulated on the mountain walls that constantly and unexpectedly falls from any given point.

  • The 2012 Dynatech expedition to the Shipilov Peak already at base camp.

    After a slightly eventful journey missing planes and even losing their baggage, the helicopter has left our expedition at Base Camp at a height of 4,200 metres. This Base Camp is common to other expeditions aiming at climbing the Pobeda and Khan Tengri peaks; therefore our mountaineers fortunately have found company in an organised environment.

  • Imminent challenges (a new year, a new challenge)

    Next September Dynatech plans to launch both the new security systems on its website and their mass production. The new QUASAR speed governors equipped with 120mm Ø pulley.

  • “First safety gear model to reach serial no. 100,000”

     “This week the PR-2500-UD progressive safety gear has been the first model, out of the 16 types of safety gears currently available, to reach the figure of 100,000 produced units. Dynatech sincerely thanks all its customers for their loyalty to our Brand; this milestone could not have been reached without them. Unit no.

  • Instructions for use and maintenance for the new model of D-BOX device for UCM
    Dynatech will start supplying its new model of D-BOX Device for UCM in the next deliveries.  The main difference from the previous model is that the 24V-Battery in the previous models has been replaced with a new 12V one. We have decided to maintain the Instructions for use and maintenance of the previous model on our website so that the Customers that have already received the previous model may continu